top of page
24 HOUR WORKOVER RIG
Watson Hopper GXHTA 500 Double Drum back in Workover unit/horizontal operations. the rig is equipped with 106'/300,000 capacity derrick, 2-500 HP drilling pumps, 235 Bbl. mud mixing unit with shale shaker, nonbearing substructure adjustable from 10' to 18, power swivel, 7-1/16" 5000#double hydraulic BOP and Annular, 4-bottle Accumulator and handling tools for 2-3/8" and 2-7/8" EUE tubing. The operation is conducted on a 24hour basis by 2 crew working 12-hour shifts.
bottom of page